A minimum of two bridges are needed in order to integrate the four
isolated overland trail loops. The construction of these bridges is a complex
undertaking, since they will be build in the floodway of the River. We will be
adding a photograph shortly of Bridge #1, which will show the location of installation.
The locations of the bridges are illustrated on the site map. Bridge
#1 is near the trailhead in Commerce Park and will link the loop of Zone 2 to that of Zone
4. Bridge #2 will be near the centerpoint of the trail, connecting the property near
First Union Bank to Berkshire Corporate Park (near GE Capital) and will link Zones 4 and
5.
The Alliance is still examining several options for the construction of
Bridge #2.